Aylesbury - Retirement Homes
Client: Churchill Retirement Homes
Value: £700,000
Duration: Nov XXXX – May XXXX
Project Description:
Retirement development consisting of 49 one and two-bedroom apartments that is located at the foot of the Chiltern Hills, in the heart of Aylesbury.
Main Scope of Work
Enabling Works
-
Set up site offices and site compound
Excavation and Filling
-
Richmond engineer set out line and level for the foundations
-
Excavated and carted approximately 80 loads of muck off site for the foundations
-
Installed Radon barrier
In-situ concrete works
-
Fixed 28 tonne of steel reinforcement to the foundations
-
Installed 60 loads of concrete to the foundations
Block and beam flooring
-
Install 110m2 of beam and block flooring
Drainage & Services
-
Lay 950m of drainage with pipe diameter up to 375mm to a depth not exceeding
-
3 metres.
-
Install 45 manholes and inspection chambers with max depth = 3 metres
-
Lay over 1000 metres of ducting
S278 Works
-
Liaised with council and organise road works for drainage connections to drainage beneath public highway.
-
Set up traffic management system
External Works
-
Laid 450m2 of tarmac base and wearing course to car park
-
Laid 220m2 of concrete block paviors to parking bays
-
Laid 120m2 of paving slab to patios and footpaths
-
Laid 520m2 of topsoil to landscaped areas